This project included the procurement, installation, commissioning and electrical interconnection of a directly coupled micro-hydro electric turbine generator  with integrated controls and switchgear including modification to existing piping, a head tank aeration system, metal framing, construction of a concrete pad, construction of a small opened walled enclosure and the procurement and installation of new electrically actuated control valves at the Quinam River Hatchery that remained operational during the entire construction process.

Owner:

Department of Fisheries and Oceans

Engineer:

HDR Fisheries Design Center